METHOD OF CALCULATING THE TOTAL ENERGY IN SUCTION AND PRESSURE PIPELINES OF THE MAIN UNITS AT RECLAMATION PUMPING STATIONS

Annotation

Purpose: theoretical substantiation of the method for calculating the total energy in suction and pressure pipelines of the main units at reclamation pumping stations to prevent unsteady processes and water hammer. 

Materials and methods: research and calculations were carried out at the pumping station “Mezhdurechye”, “Management of Stavropolmeliovodkhoz”, equipped with three main centrifugal pump units and two pressure pipelines. To calculate the total energy in the suction and pressure pipelines of the main pump, the entire pipeline network is divided into three sections: the first one is the intake, the second one is the distribution and the third one is the main pressure pipeline. For each section from 0.25 to 3.41 с²/м⁵ and the entire network 4.65 с²/м⁵, specific resistances were determined, the actual total head losses from 2.50 to 29.32 m when three units were fed into two pressure pipelines from 0.3 to 7.2 m³/s and hydraulic parameters of each unit: head (90.2 m), flow (2.67 m³/s), power (1585 kW), admissible vacuum suction head (4.2 m) at efficiency (88 %), with various operating options of the pumping station. 

Results: as a result of the research, the procedure for determining the total energy in the suction and pressure pipelines of the main units at reclamation pumping stations was determined, the total energy was calculated depending on the number of running pumping units: for suction pipelines from plus 0.1 to minus 1.5 m, for pressure pipelines from 75.79 to 86.34 m, which allows calculating the required hydraulic parameters of the booster pump used to close the back flow valve in the pressure pipelines of the main pump, to prevent backflow of water and water hammer before stopping the main pump. 

Conclusions: the above method is recommended for calculating in case of necessity the prevention of water hammer in the network by closing the back flow valve with a booster pump for reclamation stations equipped with centrifugal pumps with a maximum possible head of 120–130 m, in a complex operational option – the maximum number of pumps per one pipeline. 

doi: 10.31774/2222-1816-2021-11-1-162-173

Keywords

total energy, pressure pipeline, suction pipeline, pump unit, booster pump, water hammer 

For quoting

Shiryaev V. N., Urzhumova Yu. S., Tarasyants S. A. Method of calculating the total energy in suction and pressure pipelines of the main units at reclamation pumping stations // Scientific Journal of Russian Scientific Research Institute of Land Improvement Problems [Electronic resource]. 2021. Vol. 11, no. 1. P. 162–173. URL: http:www.rosniipm-sm.ru/en/article?n=1184 (date of access: 16.02.2021). doi: 10.31774/2222-1816-2021-11-1-162-173.

Authors

Shiryaev Vadim Nikolaevich

Position: Chief Engineer of the Research Institute “EnergoHydroMech”

Affiliation: Novocherkassk Engineering and Land Reclamation Institute – branch of the Don State Agrarian University 

Affiliation address: st. Pushkinskaya, 111, Novocherkassk, Rostov region, Russian Federation, 346428

E-mail: rekngma@magnet.ru


Urzhumova Yulia Sergeevna

Degree: Candidate of Technical Sciences

Title: Associate Professor

Position: Associate Professor of the Department of Land Reclamation

Affiliation: Novocherkassk Engineering and Land Reclamation Institute – branch of the Don State Agrarian University 

Affiliation address: st. Pushkinskaya, 111, Novocherkassk, Rostov region, Russian Federation, 346428

E-mail: rekngma@magnet.ru


Tarasyants Sergey Andreevich

Degree: Doctor of Technical Sciences

Title: Professor

Position: Professor of the Department of Water Supply and Utilization of Water Resources

Affiliation: Novocherkassk Engineering and Land Reclamation Institute – branch of the Don State Agrarian University 

Affiliation address: st. Pushkinskaya, 111, Novocherkassk, Rostov region, Russian Federation, 346428

E-mail: rekngma@magnet.ru

Bibliography

1. Ali M.S., Beglyarov D.S., Nazarkin E.E., 2020. Osobennosti rascheta perekhodnykh protsessov v vodovodakh nasosnykh stantsiy v usloviyakh obrazovaniya razryvov sploshnosti potoka [Features of calculation of transients in water pipelines of pumping stations under conditions of flow continuity discontinuity formation]. Prirodoobustroystvo [Environment Engineering], no. 4, pp. 122-128. (In Russian).

2. Gazarov A.R., Kolosov R.A., Khovrina E.I., 2019. Gidravlicheskiy udar v truboprovodakh: raschet i predotvrashchenie [Water hammer in pipelines: calculation and prevention]. Izvestiya Tul'skogo gosudarstvennogo universiteta [Bulletin of Tula State University], no. 12, pp. 557-559. (In Russian).

3. Lopa I.V., Proskuryakov N.E., 2017. Raschet prochnosti truboprovoda pri gidravlicheskom udare [Calculation of the pipeline strength at water hammer]. Izvestiya Volgogradskogo gosudarstvennogo tekhnicheskogo universiteta [Bulletin of Volgograd State Technical University], no. 9, pp. 17-20. (In Russian).

4. Abdel-Gawad H.A., Djebedjian B., 2020. Modeling water hammer in viscoelastic pipes using the wave characteristic method. Applied Mathematical Modelling, vol. 83, pp. 322-341, https:doi.org/10.1016/j.apm.2020.01.045.

5. Beglyarov D.S., Apresyan D.Sh., 2012. Metodika rascheta perekhodnykh protsessov v napornykh sistemakh vodopodachi pri puskakh nasosnykh agregatov [Calculation method of transients in pressure water supply systems under pumping starting]. Prirodoobustroystvo [Environment Engineering], no. 2, pp. 69-72. (In Russian).

6. Beglyarov D.S., Pereverzev S.Yu., 2012. Raschetno-teoreticheskiye issledovaniya perekhodnykh protsessov v zakrytoy orositel'noy sisteme [Computational and theoretical studies of transients in the closed irrigation system]. Prirodoobustroystvo [Environment Engineering], no. 4, pp. 52-57. (In Russian).

7. Beglyarov D.S., Sakharov I.Yu., 2013. Metodika rascheta perekhodnykh protsessov s uchetom klapanov dlya puska i zashchemleniya vozdukha i dliny zony razryva sploshnosti potoka [The method of transients calculation taking into account air inlet and jamming valves and the zone length of the flow continuity ruptures]. Prirodoobustroystvo [Environment Engineering], no. 2, pp. 76-79. (In Russian).

8. Shiryaev V.N., Urzhumova Yu.S., Tarasyants S.A., 2017. Sposob bor'by s gidroudarom v napornykh truboprovodakh tsentrobezhnykh nasosov [Method of Controlling Hydraulic Shock in Pressure Pipelines of Centrifugal Pumps]. Patent RF, no. 2689652. (In Russian).

9. Altshul’ A.D., 1982. Gidravlicheskie soprotivleniya [Hydraulic Resistance]. 2nd ed., rev. and add. Moscow, Nedra Publ., 224 p. (In Russian).

10. Anikin Yu.V., Tsarev N.S., Ushakova L.I., 2018. Nasosy i nasosnye stantsii: uchebnoe posobie [Pumps and Pumping Stations: textbook]. Ministry of Education and Science of the Russian Federation, Ural Federal University, Institute of Construction and Architecture, Ekaterinburg, Ural University Publ., 135 p. (In Russian).

11. Shiryaev V.N., Urzhumova Yu.S., Tarasyants S.A., Shiryaeva N.O., 2020. Ispol'zovanie busternogo nasosa v kachestve dopolnitel'nogo nasosnogo agregata pri gashenii gidravlicheskogo udara v napornykh truboprovodakh [The use of a booster pump as an additional pumping unit when damping water hammer in pressure pipelines]. Vestnik Ryazanskogo gosudarstvennogo agrotekhnologicheskogo universiteta im. P. A. Kostycheva [Bulletin of Ryazan State Agrotechnological University named after P.A. Kostychev], no. 4(48), pp. 134-147. (In Russian).

12. Karadžić U., Bergant A., Starinac D., Božović B., 2019. Water hammer investigation of the shut-down of a high-head hydropower plant at very high Reynolds number flows. Journal of Mechanical Engineering, vol. 65, iss. 7/8, pp. 430-440, https:doi.org/10.5545/sv-jme.2019.6092. 